How Long Does It Take to Get a Suit Tailored? (The Real Timeline You Need)
Stop Panicking: Here’s What You’re Actually Looking At
Contents
The timeline depends entirely on what you’re getting done. Are you commissioning a brand-new custom suit from scratch? Or are you just getting the pants hemmed on something you already own? These are two completely different animals, and the timelines reflect that.
Getting a Brand-New Custom Suit Made
The Standard Bespoke Experience
A proper bespoke suit takes 4 to 8 weeks from start to finish. I know, I know—that sounds like forever when you need it next Tuesday. But here’s what’s actually happening during those weeks:
- Day 1: You sit down with the tailor, pick your fabric (this is where I always spend way too long obsessing over the weave), and get measured within an inch of your life
- Days 1-3: They draft your pattern and cut your fabric
- Week 1-2: First fitting happens—you try on a rough version that looks frankly terrible
- Week 3-4: Second fitting—now we’re talking, things are starting to look sharp
- Week 5-8: Final fitting and adjustments, then you walk out looking like you own the place
You’ll typically need two to three fittings throughout this process. Each fitting catches issues the previous one missed. Trust me, when I skipped my second fitting once to save time, I ended up with sleeves that made me look like I was perpetually reaching for something.
Made-to-Measure: The Middle Ground
If full bespoke feels like overkill, made-to-measure suits take 4 to 6 weeks. They’re faster because the tailor works from existing patterns instead of drafting yours from scratch. You still get a quality measuring tape taken to you, but the construction process moves quicker.
Express Services (When You Really Messed Up)
Some tailors now offer express services for those of us who excel at procrastination. 7-day custom suits are available at select shops. And if you’re truly desperate, certain tailors deliver bespoke suits in as little as 3 days by keeping everything in-house. These rushed jobs usually cost extra—sometimes significantly extra. I once paid nearly double for a 5-day turnaround when my cousin surprised everyone with a destination wedding announcement six days out. Worth every penny to avoid showing up in khakis.
Altering an Existing Suit (Much Faster)
If you already own the suit and just need adjustments, breathe easier.
Simple Alterations Timeline
Basic work like hemming pants or shortening sleeves takes 2 to 3 days. These are straightforward adjustments:
- Hemming trouser legs
- Shortening jacket sleeves
- Taking in or letting out the waist slightly
- Basic tapering
I can usually drop off a suit on Monday and pick it up by Wednesday or Thursday.
Complex Alterations Timeline
More involved work takes 2 to 4 weeks. This includes:
- Shoulder adjustments (this is serious surgery on a suit)
- Significant waist suppression
- Sleeve pitch corrections
- Full jacket restructuring
When I lost 30 pounds a few years back, my favorite suit needed completely restructured. Took three weeks and honestly looked better than when I bought it. The tailor basically rebuilt the entire torso.
Rush Alterations
Most tailors offer rush services for same-day to 24-hour turnaround. Expect to pay a premium—usually 50-100% extra on top of the alteration cost. I’ve used rush services twice: once for a funeral (obviously) and once because I’m terrible at planning ahead for my anniversary dinner.
Business Bulk Orders: Plan Way Ahead
If you’re ordering suits for an entire corporate team or wedding party, block out 8 to 12 weeks minimum. Bulk orders of 10+ suits can take 6 to 10 weeks depending on complexity and customization level. I learned this the hard way when organizing suits for my brother’s groomsmen. Ordered with eight weeks to spare, thought we were golden. Two guys needed complete remakes after their fittings revealed issues, and we finished with literally two days to spare before the rehearsal dinner.
What Actually Affects Your Timeline?
Several factors can speed up or slow down the process.
Tailor Workload
Peak seasons (wedding season from May-October, holiday party season in November-December) mean longer waits. I once tried getting a tux altered in mid-June and the earliest appointment was three weeks out. Every engaged couple in a 50-mile radius apparently had the same idea.
Fabric Availability
Custom suits require fabric procurement. If you choose something exotic or imported, add 1-3 weeks to your timeline while they source it. Standard fabrics from their existing inventory keep you on the faster track.
Complexity of Work
A simple suit jacket sleeve shortening takes minutes. Reconstructing shoulders to fix a poorly-fitted jacket takes hours of skilled work.
Number of Fittings Required
Some bodies are straightforward to fit (lucky them). Others—like mine with one shoulder slightly higher than the other—require extra fittings to get everything sitting right. More fittings = more time.







